This would have been enough of a problem but....and this is a large but....some of the subfloor was rotten. A few of the boards needed to be replaced....so.....we ripped up boards. These were tongue and groove 1x6 boards. Not as easy as removing the crumbly waferboard. No more using the broom and dustpan. Out came the big daddies from the tool set. A crowbar, circular saw and some other funky-looking saw like thing. We cut, pounded, pried and smashed our way through these boards until.....I saw another problem...ugh! There was water. Now, I am quite certain that there is not supposed to be water in my hallway! Hubby looked.."Oh, no." he said rather dejectedly. The wall that was adjacent to the bathtub had ewwy-gooey water stains. The water pipes must be leaking. So another hole was cut in the wall. Now I have no floor and two walls have holes big enough that I could crawl into. This was not good. He stared at the pipe dripping. Something would need to be done. Not only was the faucet leaking into the wall, the drainpipe was spilling water everywhere under the house! He repaired the pipes, fixed the drain and replaced the torn-out floorboards. The next step was to put some sort of really smelly black "felt" down on the floor. This would go under my new plywood floors. By this time, poor Hubby, Son and I had been working for nine hours on the hallway. It was getting a bit late. We were all getting tired and it was starting to show. Our once happy chatter had lapsed, the spring in our step was lagging and we were starting to hit our thumbs with our hammers a lot more. Still, we should not quit as there were large holes in the wall!
As it neared time to place the plywood on the floor, each of us looked at the other. We were tired..worn out..exhausted. This two hour project had now taken over ten hours and was not nearly finished. As I said, one thing leads to another..and if anything bad could happen, it would. In the process of ripping out floors, a couple of small holes were accidentally knocked in the walls. They would have to be replaced. If we are going to replace the walls, something had to be done to the ceiling. If the ceiling was redone, the light fixtures needed replacing. All of this required new trim and baseboards. Painting would be required to freshen up the doors. Why, oh why did I ever asked for a cabinet? One simple cabinet to be built in the hallway.
No comments:
Post a Comment